Water demands for the City were developed in detail in the 2018 Basis of Design Report for the 2019-2020 Water System Improvements Project, including a discussion of service areas, projected populations, and historical and projected water usage.
Plant Capacity Design Conditions
Annual Average Demand | 0.6 MGD (6.5 hours) |
Maximum Day Demand | 1.75 MGD (14.05 hours) |
Winter Production Rate | 1,100 gpm |
Winter Minimum Operation | 0.26 MGD (4 hrs) |
Firm Capacity Production Rate (1) | 2,100 gpm |
Available Firm Capacity (1) | 2.646 MGD (21 hours) |