Water demands for the City were developed in detail in the 2018 Basis of Design Report for the 2019-2020 Water System Improvements Project, including a discussion of service areas, projected populations, and historical and projected water usage.
Plant Capacity Design Conditions
| Annual Average Demand | 0.6 MGD (6.5 hours) |
| Maximum Day Demand | 1.75 MGD (14.05 hours) |
| Winter Production Rate | 1,100 gpm |
| Winter Minimum Operation | 0.26 MGD (4 hrs) |
| Firm Capacity Production Rate (1) | 2,100 gpm |
| Available Firm Capacity (1) | 2.646 MGD (21 hours) |